Citation standards: the order we trust sources
| Tier | Source type | Examples |
|---|---|---|
| 1 | Statute and regulation | 18 CFR Part 1304 (TVA 26a), 44 CFR Parts 59–60, Minn. Stat. 462.357, NH RSA 483-B, Wisconsin NR 115 |
| 2 | Agency fee schedules, permit forms and shoreline management plans | Duke Energy Lake Services guidelines, Ameren SMP, USACE lake SMPs, FEMA technical bulletins |
| 3 | Adopted codes and standards | NEC Article 555, IRC, IBC, NSF/ANSI 40 and 245 |
| 4 | Manufacturer and contractor published data | Package price ranges, product ratings |
| 5 | Our own model | Labeled LBV wherever it is the basis of a number |
When a lower tier conflicts with a higher one, the higher tier wins and we say so. Where local ordinances may be stricter than a state floor, the page says to verify locally. Paraphrased rules are presented as paraphrases, never as invented quotations.
How numbers are presented
- Costs are ranges with a year (currently 2026), never single-point promises.
- The same fact carries the same number on every page and in every calculator; one parameter file feeds all of them, as described on the methodology page.
- Worked examples show every input so a reader can rerun the math.
- Statements about fees, setbacks and deadlines name the authority that sets them.
Vendor audits: how they stay neutral
- No vendor pays for, commissions, reviews or approves an audit before it is published.
- Audits compare published package scope with the full turnkey scope, and frame gaps as "what the package price does not include" and "questions to ask."
- We do not accuse any named company of wrongdoing or speculate about intent.
- Every brand is measured with the same method and the same cost parameters.
- Vendors may submit documented corrections to facts; opinions about framing are not corrections.
Some firms we introduce projects to may pay referral fees, as disclosed on the about page. Whether a firm pays has no effect on cost ranges, audit findings, rankings or which firms are mentioned in an article.
Corrections
- Send the page, the statement and your evidence to hello@lakeviewbuilding.com.
- We acknowledge within two business days and check the claim against the source hierarchy above.
- If we were wrong, we fix the page and any calculator that uses the value, and add a dated correction note.
- If we disagree, we reply with the source we relied on.
Readers checking a specific lot rather than a published page can use the review request instead.
Dating and updates
Every page states the cost year. When an agency changes a fee or a rule, we update the page and every calculator that uses the value together, so the same fact never carries two numbers on the site.
Frequently asked questions
Do vendors see audits before publication?
No. Audits are written from published package information and our cost model. Vendors can send documented factual corrections after publication, which we review using the same process as any reader correction.
Why do you cite regulations instead of news articles?
Because the regulation or the agency's own fee schedule is what a permit reviewer will apply. Secondary sources go out of date or simplify. When we cannot find a primary source, we say the figure is an estimate.
How fast are corrections made?
We acknowledge correction requests within two business days. Documented errors in fees, deadlines or code requirements are fixed as soon as they are verified, with a dated note on the page.